First, the preparation of the injection molding machine before starting
1. Wear safety protective clothing as prescribed by the workshop before production.
2. Clean up the environment around the equipment and do not store any items unrelated to production.
3. Clean the inside and outside of the workbench and equipment, and wipe the injection seat guide rail and the clamping part of the mold with clean cotton yarn.
4. Check whether the control switches, buttons, electrical circuits, operating handles, and handwheels of the equipment are damaged or malfunction. Each switch and handle should be in the “off” position.
5. Check whether the safety protection devices of all parts of the equipment are in good condition and work sensitive and reliable. Check whether the test “emergency stop” is effective and reliable, whether the safety door slide is flexible, and whether the limit switch can be activated during the switch.
6. The safety protection devices on the equipment (such as mechanical lock levers, stop plates, safety protection switches, etc.) are not allowed to move freely, and are not allowed to be modified or deliberately rendered useless.
7. Check whether the screws of each part are tightened, whether there is looseness, and if the parts are abnormal or damaged, report to the foreman. The foreman should handle the work or notify the maintenance personnel.
8. Check each cooling water line and try to pass the water to see if the water flow is smooth, whether it is blocked or dripping.
9. Check if there is any foreign matter in the hopper. Do not store any objects above the hopper. The hopper cover should be covered to prevent dust and debris from falling into the hopper.
youngstrong
Dongguan Taiwang Machinery Co.,LTD
Add:NO.85,Tianxin Street,Chongkou Industrial district,Dongguan city,China.
Wedsite:www.twmachines.com
Mobile:86-13829232752
Tel:86-769-81701081
Email:[email protected]
Leave a Reply
Want to join the discussion?Feel free to contribute!