What is the cause of screw breakage of vertical injection molding machine?
1): The injection is not synchronized, and the transmission synchronization is adjusted ±0.05.
2): The injection rubber cylinder is not synchronized, and the injection rubber cylinder is adjusted to ±0.05.
3): The raw material is not compatible with the performance of the screw of the injection molding machine.
4): The temperature does not reach the melting point of the material used.
5): Wait until the temperature has just reached and turn the screw.
6): The heating tube is burnt and not heated, check whether there is anti-cold function, and replace the heating tube.
youngstrong
Dongguan Taiwang Machinery Co.,LTD
Add:NO.127,longyan road,Chongkou Industrial district,Dongguan city,China.
Wedsite:www.twmachines.com
Mobile:86-13829239482
Tel:86-769-81701081
Email:[email protected]